chulha_construction3On a midwinter’s morning Mr. Ramesh Kikkeri (of  Swami Vivekananda Youth Movement, SVYM) along with 4 volunteers visited Thimmaiyanadoddi to train home owners to make their own smokeless chulha. The  chulha was designed by IISc and Mr.Kikkeri has become proficient in building them.

Mr. Kikeri came to the village equipped with the form-work needed to build the chulha. Surrounded by enthusiastic villagers, he started demonstrating step by step methods to build the chulha. Two villagers came forward to volunteer with the building and we made a demo piece near the community center so that the villagers could refer to it anytime.

What did we need to prepare it?

chulha_construction

The following were the step-by-step method to build the smokeless chulha:

  1. Prepare the mix and keep aside in the ratio of 5:2.5:1 Mud: Quarry dust: Cement
  2. Keep the framework (mould) in place:
  • Align mould to wall perpendicular edge of wall. Check for placement of pipe beforehand. Use screw to fix frames.
  • Place inner mould with 3 circular cut-outs such that the smallest circular cut out is placed where pipe is to be fixed.
  • Check for alignment using aligning instrument.
  • Apply cow dung mix in the inner surface of the mould
  1. Ram earth inside the fixed frame. Earth has to be thoroughly rammed after every 6’’ layer of mix in the frame. 3-4 bricks can be used to keep the mould from buckling while ramming.
  2. Remove inner frame once the earth is rammed to surface level of lower mould.
  3. Place the upper mould on top of the rammed earth aligning with the external frame and repeat the process of ramming earth inside it.
  4. Check alignment for pipe fixing and fix 5’’ diameter pipe clamped to the wall so that once fired the smoke escapes outside the kitchen either through the wall or the roof.
  5. Place grating perpendicular to the chulha axis in the first and second circular cut out.
  6. De-mould the upper layer framework.
  7. Fixing M.S plate over the rammed earth while checking circular cutout alignment and place the recovery vessel in the upper layer cut out.

chulha_construction2

This whole process took around 3-4 hours and could be done by 2 adults. The chulha now had to be cured for a minimum of 7 days for firing and regular usage.

After the demonstration the villagers were very excited to build the chulha in their kitchen. Within a few weeks time the house owners built 6-8 chulhas all by themselves. Slowly the entire village was using smokeless chulha and their practice convinced us of the efficiency of this technology.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s